Architectural asphalt shingle roofing

A shingle roof is only as good as the deck beneath it.

We inspect the attic, roof deck, existing layers, slope, flashings and ventilation before specifying a system. Then we build the assembly your property actually needs—from plywood correction and dry-in through shingles, cleanup and warranty registration.

  • Deck-first inspection
  • Slope-specific dry-in
  • New flashing details
  • Photo documented
Completed architectural asphalt shingle roof installed by Zenith Roofing Services
Real Zenith work: completed architectural shingle roofing with finished ridge, penetrations and edge details.
Inspect before specifyingAttic, substrate, slope and layers Continuous nailing surfacePlywood correction when needed Matched roof assemblyUnderlayment by slope and system Clean closeoutPhotos, cleanup and warranty records

The first decision happens underneath

We inspect the attic and substrate before we price the roof assembly.

Older Southern California homes may have plywood, OSB, solid planks, tongue-and-groove boards, skip sheathing or a former wood-shake deck. Those conditions change the tear-off, ventilation and nailing-surface requirements.

Our practical standard: skip sheathing, former shake decks and plank decks with excessive gaps receive a continuous plywood or OSB overlay. We commonly specify 7/16-inch OSB or 15/32-inch CDX, subject to the existing structure, engineering and applicable requirements.

Even sound tongue-and-groove deserves careful review because shingle nail zones must consistently land in solid material. We explain the visible conditions and the contract unit prices for concealed wood replacement before work begins.

Existing plank roof deck exposed during asphalt shingle tear-off
Existing plank deck exposed for inspection.
Tape measure documenting a wide gap between roof deck planks
Field measurement documents deck gaps before correction.

Slope determines the assembly

We do not install shingles on roofs below 2:12.

A roof that looks like a shingle roof may include low-slope sections—or even an older tar-and-gravel roof hidden below a later overlay. We verify pitch and exposed conditions before choosing the dry-in method.

Below 2:12

Use a low-slope system

Asphalt shingles are not our solution here. We recommend a compatible flat or low-slope roof system.

4:12 and steeper

Standard system dry-in

A compatible single synthetic underlayment is commonly used with the complete manufacturer system, subject to the specified product and conditions.

Exact components and installation details follow the selected manufacturer instructions, approved scope and applicable code—not a generic one-size-fits-all recipe.

More than the visible shingle

The complete roof system we walk through with you.

We have installed systems from Malarkey, Owens Corning, GAF, CertainTeed and IKO. Brand selection follows the roof—not the other way around.

01

Deck & wood correction

Replace documented dry rot and establish a suitable continuous nailing surface where required.

02

Dry-in & vulnerable details

Synthetic or self-adhered underlayment selected by slope, plus enhanced protection at specified transitions.

03

Metal & flashing

New drip edge and specified pipe, chimney, wall and penetration flashings—not black mastic standing in for proper metal.

04

Starter, field & ridge

Compatible starter shingles, architectural field shingles, and matching hip and ridge components.

05

Balanced ventilation

Intake and exhaust are evaluated for the actual attic. Options may include fire-rated O'Hagin vents, dormers or solar attic ventilation.

06

Closeout documentation

Progress photos, final cleanup, magnetic sweep, invoice and eligible manufacturer warranty registration.

Asphalt shingle tear-off revealing plank decking and new plywood installation
Tear-off reveals the truth. Extra layers and concealed deck conditions cannot always be confirmed until the roof is opened.
Titanium synthetic underlayment installed on a shingle roof deck
System-matched dry-in. Underlayment is selected for the pitch and specified shingle assembly.
Self-adhered membrane detail installed around a brick chimney
Transitions receive focused detailing. Chimneys and penetrations are integrated before shingles cover the work.

A transparent installation

From attic check to final magnetic sweep.

  1. 1

    Inspect and define the scope

    Check the attic, substrate, pitch, ventilation and visible signs of previous layers or problem flashing.

  2. 2

    Protect, tear off and document

    Remove the existing roofing, verify concealed layers, photograph the deck and identify wood requiring correction.

  3. 3

    Repair the deck and dry in

    Complete approved wood work, install the specified underlayment and integrate critical transition protection.

  4. 4

    Install flashings, ventilation and shingles

    Complete the specified metal, starter, field shingles, ventilation, hip and ridge components as one coordinated system.

  5. 5

    Clean, photograph and close out

    Blow off the roof, clean gutters and grounds, haul debris, perform a magnetic sweep and deliver the project records.

A note about old shake and skip-sheathed roofs

Opening these roofs can expose the attic directly to weather and pests. Zenith does not perform insulation work. If insulation replacement is planned, coordinate it with a qualified insulation contractor; in many cases it is safest to close and dry in the roof promptly, then complete insulation work afterward.

Completed painted chimney flashing on an architectural shingle roof

Finish details and registered protection

The proposal should tell you what system you are buying.

Depending on the selected manufacturer and scope, an eligible complete-system warranty may be available. Zenith documents the installed products and registers the specified warranty when included in the contract.

  • Specified shingle manufacturer and product
  • Underlayment and accessory components
  • Ventilation and flashing scope
  • Wood and extra-layer unit pricing
  • Photos, invoice and warranty documents
Ask Us to Compare Systems

Common asphalt shingle questions

What property owners ask before tear-off.

Can you confirm every existing roof layer before work starts?

Not always. Mastic around penetrations, roof edges and low-slope sections may provide clues, but the exact assembly can remain hidden until tear-off. Our proposal identifies unit prices for extra layers and concealed wood work.

What happens if you find skip sheathing, wood shakes or wide plank gaps?

We establish a suitable continuous nailing surface, commonly with an approved plywood or OSB overlay. The exact material and fastening plan depend on the structure and documented scope.

Can asphalt shingles go on a roof below 2:12?

Zenith does not install asphalt shingles below 2:12. We evaluate those areas for a compatible low-slope roof system instead.

Which underlayment will you use?

That depends on slope, shingle manufacturer and conditions. Steeper roofs commonly receive a compatible synthetic underlayment. Roofs from 2:12 to under 4:12 require an enhanced assembly such as approved full-roof self-adhered protection or double underlayment with 50% overlap.

Do you install ventilation during a shingle replacement?

We evaluate intake and exhaust for the actual attic and roof. The proposal may specify fire-rated O'Hagin vents, dormers, solar attic ventilation or another compatible solution; no single vent type is correct for every property.

What happens at project completion?

We remove debris, blow off the roof, clean the gutters and work area, perform a final magnetic sweep, share project photos and provide the invoice and applicable warranty documentation.

Start with the roof you actually have

Tell us about your shingle roof.

Photos of the roof, attic framing or existing deck help. We will inspect the slope, substrate, layers, flashing and ventilation before recommending a system.

*Free estimates exclude real-estate transaction inspections and written reports. See our paid inspection options on the pricing page.

Asphalt shingles, specified from the deck up

Get a clear roof-system recommendation.